Browsing Archive: September, 2010

View from roof on Marlborough St., Boston

Posted by Alexandra Storrs on Friday, September 24, 2010, In : Marlborough St., Boston liner job 

Here is an awesome picture from atop the roof on Marlborough St. in beautiful Back Bay Boston.  They are looking outbound towards Massachusetts Avenue. http://www.dmstorrschimney.com/our-soot-stories/fireplace-flue-liners-marlborough-st-boston
Continue reading ...
 

Fireplace flue liners Marlborough St., Boston

Posted by Alexandra Storrs on Friday, September 24, 2010, In : Marlborough St., Boston liner job 

Here we are loaded up with 80' of 304 stainless steel heavy wall fireplace liner.  It was quite a challenge to get all of this material loaded onto our truck, but there it is!  Heading into Boston's Back Bay for two days so our client can have her fireplaces up and working for the holidays. To see other liner jobs http://www.dmstorrschimney.com/our-soot-stories/brookline-liner
Continue reading ...
 

Brookline Liner

Posted by Alexandra Storrs on Friday, September 17, 2010, In : Brookline Liner 

Here Dana & Brad are loading 40' of stainless steel liner for a boiler flue in Brookline.  Unfortunately we don't have pictures of the installation process (they were too busy).  To see part of an installation http://www.dmstorrschimney.com/our-soot-stories/belmont-stainless-steel-liner-new-construction
Continue reading ...
 

Firebox construction complete

Posted by Alexandra Storrs on Monday, September 13, 2010, In : Firebox Construction 

Construction of the firebox is complete.  Once the flue is lined this will be a working fireplace.  It is ready for the builder to add the finishing touches.  The facade will be the final addition to this project.  To see other stages of this project http://www.dmstorrschimney.com/our-soot-stories/firebox-construction-part-3
Continue reading ...
 

Firebox construction part 3

Posted by Alexandra Storrs on Thursday, September 9, 2010, In : Firebox Construction 

A lot of progress has been made.  The inside walls of the firebox are complete, as is the facade.  All that is left to do is finish the top.  To see earlier photos of this project http://www.dmstorrschimney.com/our-soot-stories/firebox-construction-part-2
Continue reading ...
 

Firebox construction part 2

Posted by Alexandra Storrs on Friday, September 3, 2010, In : Firebox Construction 

You can see the back wall and the floor of the firebox is complete using yellow firebrick.  There are a few more phases of this project to follow, so be sure to check back with us.  To see the before we got started picture click
http://www.dmstorrschimney.com/our-soot-stories/firebox-construction
Continue reading ...
 

Firebox construction

Posted by Alexandra Storrs on Wednesday, September 1, 2010, In : Firebox Construction 

This is the start of a firebox reconstruction project in Boston.  Dana had the luxury of starting anew in a gutted condo unit.  It doesn't look like much in this picture... it gets better, much better.  Check back for follow up photos.  For other completed fireplace projects http://www.facebook.com/home.php?#!/album.php?aid=27776&id=130661380277547&ref=mf
Continue reading ...
 
 
xyz

About Me


Dana M Storrs AT DM Storrs Chimney, we combine traditional chimney sweeping methods with current and future technologies in the chimney and venting industry. We are a fully-insured and licensed family owned business serving your local community. Chimney Safety Institute of America(CSIA) certified Massachusetts Construction Supervisor License (CSL) OSHA trained