DM Storrs Chimney

Browsing Archive: October, 2011

Franklin Institute Boston

Posted by Alexandra Storrs on Thursday, October 27, 2011, In : Commercial Venting 

This picture shows venting from the left side horizontally 20 ft (second of three total wall penetrations) then vertical 30 ft to outside wall termination which is 14 ft off of ground level.  All of this pipe is double wall AL294C special gas vent.  To see the boilers this pipe is venting click 
http://www.dmstorrschimney.com/our-soot-stories/franklin-institute-boston-part-1-


Continue reading ...
 

Franklin Institute Boston (part 1)

Posted by Alexandra Storrs on Thursday, October 27, 2011, In : Commercial Venting 

This is one of two Hydrotherm gas boilers installed at the Franklin Institute of Boston.  It's hard to believe that something so small can heat a building that size.  Dana was contracted to construct and install the AL294C single and double wall pipe for these condensing boilers.  Two 80 ft side wall stacks needed to be constructed and installed to vent these boilers.  The horizontal runs going from the boilers into the 80 ft stacks also needed to be constructed and installed from the same ma...

Continue reading ...
 
 
xyz

About Me


Dana M Storrs AT DM Storrs Chimney, we combine traditional chimney sweeping methods with current and future technologies in the chimney and venting industry. We are a fully-insured and licensed family owned business serving your local community. Chimney Safety Institute of America(CSIA) certified Massachusetts Construction Supervisor License (CSL) OSHA trained