Posted by Alexandra Storrs on Thursday, July 16, 2015, In : Commercial Venting 


Today is day two of a large liner project in Boston.  We are installing two 70' stainless steel liners to vent gas fired boilers which provide heat to two apartment buildings.  This photo of the venting for one of the chimneys.  These sections of liner will be connected with stainless steel couplers and installed into the flue.

Continue reading ...
 

Eastern Nazarene 4

Posted by Alexandra Storrs on Friday, May 29, 2015, In : Commercial Venting 


Dana posing with another custom fabricated stainless steel transition component.  
For other photos of this project... http://www.dmstorrschimney.com/our-soot-stories/eastern-nazarene-3
Continue reading ...
 

Eastern Nazarene 3

Posted by Alexandra Storrs on Friday, May 29, 2015, In : Commercial Venting 


This is a picture of the wye needed for the interior pipe work in the boiler room.  Dana is posing with it for scale. For earlier photos of this project... http://www.dmstorrschimney.com/our-soot-stories/eastern-nazarene-2


Continue reading ...
 

Eastern Nazarene 2

Posted by Alexandra Storrs on Tuesday, May 19, 2015, In : Commercial Venting 


This picture is to show the size of the pipe compared to the truck.  An adult fits comfortably inside a single pipe section!  
http://www.dmstorrschimney.com/our-soot-stories/eastern-nazarene-college-1

Continue reading ...
 

Eastern Nazarene College 1

Posted by Alexandra Storrs on Tuesday, May 19, 2015, In : Commercial Venting 


Commercial Industrial liner project at Eastern Nazarene College in Quincy.  The liner sections you see are 5' sections of 32" round stainless steel.  This is the largest liner our manufacturer has ever made.  Therefore, it is the largest liner we have ever installed.  This liner is 60' in height and is venting two boilers the size of freight train cars. to see another commercial industrial project 
http://www.dmstorrschimney.com/our-soot-stories/walpole-town-hall
Continue reading ...
 

Walpole Town Hall

Posted by Alexandra Storrs on Thursday, October 9, 2014, In : Commercial Venting 


Last week we spent two days installing liners at the Walpole Town Hall to vent new boilers.  We installed both Centrotherm flex vent and Fasnseal liner systems.  Dana & Melissa are in the boom in the rain installing the liners, while Jon was in the boiler room making the connections and staying dry.

Continue reading ...
 

Fessenden School, Newton, MA Commercial Venting

Posted by Alexandra Storrs on Thursday, June 5, 2014, In : Commercial Venting 


These are two of many crates of material for this job.  Material was delivered by freight directly to the site.  This is 50' of 28" round Model G chimney system.  It comes to us from Michigan via a local supplier in Randolph.  The pipe is installed in sections to make it more manageable at the top of the chimney.  This material is specific to venting an industrial gas boiler.  These particular boilers are the size of a locamotive steam engines.  This was to vent 2 of these boilers which provi...

Continue reading ...
 

Franklin Institute Boston

Posted by Alexandra Storrs on Thursday, October 27, 2011, In : Commercial Venting 

This picture shows venting from the left side horizontally 20 ft (second of three total wall penetrations) then vertical 30 ft to outside wall termination which is 14 ft off of ground level.  All of this pipe is double wall AL294C special gas vent.  To see the boilers this pipe is venting click 
http://www.dmstorrschimney.com/our-soot-stories/franklin-institute-boston-part-1-


Continue reading ...
 

Franklin Institute Boston (part 1)

Posted by Alexandra Storrs on Thursday, October 27, 2011, In : Commercial Venting 

This is one of two Hydrotherm gas boilers installed at the Franklin Institute of Boston.  It's hard to believe that something so small can heat a building that size.  Dana was contracted to construct and install the AL294C single and double wall pipe for these condensing boilers.  Two 80 ft side wall stacks needed to be constructed and installed to vent these boilers.  The horizontal runs going from the boilers into the 80 ft stacks also needed to be constructed and installed from the same ma...

Continue reading ...
 
 
xyz

About Me


Dana M Storrs AT DM Storrs Chimney, we combine traditional chimney sweeping methods with current and future technologies in the chimney and venting industry. We are a fully-insured and licensed family owned business serving your local community. Chimney Safety Institute of America(CSIA) certified Massachusetts Construction Supervisor License (CSL) OSHA trained