Pinckney St., Beacon Hill Rebuild (con't)

Posted by Alexandra Storrs on Tuesday, April 8, 2014, In : Liner Jobs 


Here is a better look at the termination of the Centrotherm vent.  Centrotherm venting is used for some high condensing boiler applications. 

Continue reading ...
 

Pinkney St., Beacon Hill Rebuild (con't)

Posted by Alexandra Storrs on Tuesday, April 8, 2014, In : Chimney Rebuilds 


Forgive me, for I have been remiss in my blogging!!  I will finish the progression photos on this job, I promise.  
Then it will be on to other, more diverse projects!  Here is the front chimney on this project staged.  The rebuild is complete except for the new cement crown, which will be poured.  You can see all the flues in this chimney and the termination for the Centrotherm flex vent liner.

Continue reading ...
 

Pinckney St., Beacon Hill Chimney Rebuild Front Chimney (con't)

Posted by Alexandra Storrs on Thursday, March 21, 2013, In : Chimney Rebuilds 

A nice side view of the front chimney & the staging.  Progress is being made... thankfully the weather cooperated with us during the entire 4 weeks of the project!  As always, here is a link for earlier progression photos http://www.dmstorrschimney.com/our-soot-stories/pinckney-st-beacon-hill-rebuild-front-chimney-con-t-
Continue reading ...
 

Pinckney St., Beacon Hill Rebuild Front Chimney (con't)

Posted by Alexandra Storrs on Thursday, March 21, 2013, In : Chimney Rebuilds 

This is a picture looking down into the chimney as it is being rebuilt.  This is a six flue chimney, being rebuilt using wythe bricks to divide the individual flues.  The pipes seen in the upper left flue are the vents for a high efficiency gas boiler.  Two vents are necessary, one is to vent the combustion from the appliance and the other is for intake air.  For earlier photos of this project http://www.dmstorrschimney.com/our-soot-stories/pinckney-st-beacon-hill-rebuild-con-t-
...
Continue reading ...
 

Pinckney St., Beacon Hill Rebuild (con't)

Posted by Alexandra Storrs on Thursday, March 21, 2013, In : Chimney Rebuilds 

Another picture of chimney demolition.  Brad & Dave are carefully taking down the rear chimney on Pinckney Street. All the debris was placed into the buckets seen here & hand carried down to the street to be placed into the onsite dumpster. To take a look at the demolition of the front chimney click http://www.dmstorrschimney.com/our-soot-stories/pinckney-st-beacon-hill-rebuilds-demolition
Continue reading ...
 

Revere Street Boston (complete)

Posted by Alexandra Storrs on Tuesday, November 23, 2010, In : Revere Street Liner 

Here is a great shot of the view from atop Revere St., Beacon Hill.  The chimney in the corner is the one Dana & Brad lined.  You can see the lid of the rain cap has been put back on, they are done!!  All in a day's work.  For other photos of this job http://www.dmstorrschimney.com/our-soot-stories/revere-st-boston-smoke-pipe-work-
Continue reading ...
 
 
xyz

About Me


Dana M Storrs AT DM Storrs Chimney, we combine traditional chimney sweeping methods with current and future technologies in the chimney and venting industry. We are a fully-insured and licensed family owned business serving your local community. Chimney Safety Institute of America(CSIA) certified Massachusetts Construction Supervisor License (CSL) OSHA trained