Custom Copper Rain Caps Installed

Posted by Alexandra Storrs on Wednesday, January 13, 2016, In : Custom Rain Caps 


Here are the three custom copper caps (shrouds) installed.  All hands on deck & perfect weather for this install.

Continue reading ...
 

Custom Copper Rain Caps (aka Shrouds)

Posted by Alexandra Storrs on Wednesday, January 13, 2016, In : Custom Rain Caps 


Custom fabricated copper rain caps, also referred to as shrouds.  These came to us from a supplier in PA.  The heaviest one fully crated was almost 500 lbs.  These were brought to the top of the chimneys without a man lift, crane or cherry picker.  Good old fashioned hard work & ingenuity got these to the top of the chimneys & installed safely.

Continue reading ...
 

Cape Cod Stone Veneer (After)

Posted by Alexandra Storrs on Tuesday, September 29, 2015, In : Fireplaces 


Here is the finished project.  Dana used Vineyard Granite Ledge Stone and installed a custom cut blue stone hearth.  We lined the fireplace flue and made other masonry repairs.  All ready for the cold Cape Cod weather. To see the before photo... http://www.dmstorrschimney.com/our-soot-stories/cape-cod-stone-veneer-before-



Continue reading ...
 

Cape Cod Stone Veneer (Before)

Posted by Alexandra Storrs on Tuesday, September 29, 2015, In : Fireplaces 


If asked we will make the trip to an existing client's summer home.  These clients wanted an updated look to the fireplace in the family summer home.  This is before... we removed the hearth & prepped for a new hearth. To see other fireplace projects 
http://www.dmstorrschimney.com/our-soot-stories/category/Fireplaces
Continue reading ...
 

Park Dr., Boston

Posted by Alexandra Storrs on Thursday, July 16, 2015, In : Commercial Venting 


Today is day two of a large liner project in Boston.  We are installing two 70' stainless steel liners to vent gas fired boilers which provide heat to two apartment buildings.  This photo of the venting for one of the chimneys.  These sections of liner will be connected with stainless steel couplers and installed into the flue.

Continue reading ...
 

Our New Office

Posted by Alexandra Storrs on Wednesday, June 10, 2015, In : Office 


We are happy to announce we have moved to 263 Central St., Foxboro, MA 02035

Continue reading ...
 

Eastern Nazarene 4

Posted by Alexandra Storrs on Friday, May 29, 2015, In : Commercial Venting 


Dana posing with another custom fabricated stainless steel transition component.  
For other photos of this project... http://www.dmstorrschimney.com/our-soot-stories/eastern-nazarene-3
Continue reading ...
 

Eastern Nazarene 3

Posted by Alexandra Storrs on Friday, May 29, 2015, In : Commercial Venting 


This is a picture of the wye needed for the interior pipe work in the boiler room.  Dana is posing with it for scale. For earlier photos of this project... http://www.dmstorrschimney.com/our-soot-stories/eastern-nazarene-2


Continue reading ...
 

Walpole Town Hall

Posted by Alexandra Storrs on Thursday, October 9, 2014, In : Commercial Venting 


Last week we spent two days installing liners at the Walpole Town Hall to vent new boilers.  We installed both Centrotherm flex vent and Fasnseal liner systems.  Dana & Melissa are in the boom in the rain installing the liners, while Jon was in the boiler room making the connections and staying dry.

Continue reading ...
 

Chimney Under Ivy

Posted by Alexandra Storrs on Thursday, September 11, 2014, In : Top Hat Tips 


Believe it or not, there is a chimney underneath all this ivy.  The homeowner called because he was having a draft issue. The ivy is the reason why.  Draft issues are one problem caused by ivy on a chimney.  The ivy also makes a great nesting place for birds or other critters, which may wind up in the chimney, causing an obstruction.  Ivy also damages the masonry.  It can get embedded in the mortar joints causing weakness in the mortar joints and can ultimately damage them.  Bottom line, even...

Continue reading ...
 

Back Bay Chimney Struck by Lightening

Posted by Alexandra Storrs on Wednesday, August 27, 2014, In : Top Hat Tips 


Yes, chimneys do get struck by lightening.  A lightening strike to a chimney can cause a significant amount of damage.  
That damage can affect the structural integrity of the chimney.  In this case on Marlborough St., in Boston's Back Bay, the force of the lightening strike sent brick flying down to the street and through someone's skylight.  Always have your chimney inspected after a lightening strike.  Even if it looks ok, best to be safe.

Continue reading ...
 

Fireplace Facade Stone Veneer in Waltham Complete!

Posted by Alexandra Storrs on Friday, August 15, 2014, In : Fireplaces 


Finished!  Instead of ta-da, around here we like to say Da-na!  I wish the lighting was better in this photo.  Big difference, looks so much better & the client was thrilled!  This project took about five days start to finish. Fore before an progression photos http://www.dmstorrschimney.com/our-soot-stories/fireplace-facade-stone-veneer-in-waltham-con-t-aug-15-2014-3-26-22-pm-22 

Continue reading ...
 

Fireplace Facade Stone Veneer in Waltham (con't)

Posted by Alexandra Storrs on Friday, August 15, 2014, In : Fireplaces 


Almost done.  Mantle was protected to avoid scratches.  Wood supports are removed once the mortar sets.  Dana & Dave are adding the finishing touches.  For before and progression photos 
http://www.dmstorrschimney.com/our-soot-stories/fireplace-facade-stone-veneer-in-waltham-con-t-
Continue reading ...
 

Fireplace Facade Stone Veneer in Waltham (con't)

Posted by Alexandra Storrs on Tuesday, August 12, 2014, In : Fireplaces 


This is a progression photo.  The hearth material is bluestone.  We custom order the hearth material which is cut to size. The wood is to support the stones over the firebox opening.  This particular veneer is actual stone as opposed to cultured stone.  To see the before photo... 
http://www.dmstorrschimney.com/our-soot-stories/fireplace-facade-stone-veneer-in-waltham
Continue reading ...
 

Fireplace Facade Stone Veneer in Waltham

Posted by Alexandra Storrs on Tuesday, August 12, 2014, In : Fireplaces 


This is client reached out to us to give his fireplace facade an updated look.  Here is a look at the fireplace before we started.  Our material is sourced from a local masonry dealer, who in turn gets most of him material locally here in MA. As you can see the floor is protected.  Dana likes to lay the stone out before applying it.  I equate it to a jig saw puzzle.


Continue reading ...
 

Fessenden School Newton, MA Commercial Venting (con't)

Posted by Alexandra Storrs on Tuesday, April 8, 2014, In : Liner Jobs 


Here is a look at the staging required for the liner installation.  

Continue reading ...
 

Fessenden School Newton, MA Commercial Venting

Posted by Alexandra Storrs on Tuesday, April 8, 2014, In : Liner Jobs 


This ivy tower is really a 50' chimney stack venting boilers for a school.  We will install 50' of 28" round Selkirk Model PS Chimney venting.  This stack will be professionally staged by our friends at Veteran's Scaffolding.

Continue reading ...
 

Pinckney St., Beacon Hill, Boston Finished

Posted by Alexandra Storrs on Tuesday, April 8, 2014, In : Chimney Rebuilds 


 Finally finished.  This is an up close photo of the completed chimney.  The vent pictured is the intake vent for make up air for the heating appliance.  Beautiful mortar joints, if I do say so myself :-)


Continue reading ...
 

Pinckney St., Beacon Hill Chimney Rebuild Front Chimney (con't)

Posted by Alexandra Storrs on Thursday, March 21, 2013, In : Chimney Rebuilds 

A nice side view of the front chimney & the staging.  Progress is being made... thankfully the weather cooperated with us during the entire 4 weeks of the project!  As always, here is a link for earlier progression photos http://www.dmstorrschimney.com/our-soot-stories/pinckney-st-beacon-hill-rebuild-front-chimney-con-t-
Continue reading ...
 

Pinckney St., Beacon Hill Rebuild Front Chimney (con't)

Posted by Alexandra Storrs on Thursday, March 21, 2013, In : Chimney Rebuilds 

This is a picture looking down into the chimney as it is being rebuilt.  This is a six flue chimney, being rebuilt using wythe bricks to divide the individual flues.  The pipes seen in the upper left flue are the vents for a high efficiency gas boiler.  Two vents are necessary, one is to vent the combustion from the appliance and the other is for intake air.  For earlier photos of this project http://www.dmstorrschimney.com/our-soot-stories/pinckney-st-beacon-hill-rebuild-con-t-
...
Continue reading ...
 

Pinckney St., Beacon Hill Rebuild (con't)

Posted by Alexandra Storrs on Thursday, March 21, 2013, In : Chimney Rebuilds 

Another picture of chimney demolition.  Brad & Dave are carefully taking down the rear chimney on Pinckney Street. All the debris was placed into the buckets seen here & hand carried down to the street to be placed into the onsite dumpster. To take a look at the demolition of the front chimney click http://www.dmstorrschimney.com/our-soot-stories/pinckney-st-beacon-hill-rebuilds-demolition
Continue reading ...
 

Stone Veneer Application in Sharon - Finished

Posted by Alexandra Storrs on Thursday, December 6, 2012, In : Fireplaces 

 
Here is the finished project.The homeowners are thrilled with the end result!  Dana used blue stone on the hearth and a cultured stone veneer on the walls.  Durarock had to be installed prior to the stone veneer application.  The shelves were added by the homeowner before the stone veneer was complete.  This link is to the during photo http://www.dmstorrschimney.com/our-soot-stories/stone-veneer-application-in-sharon-during
Continue reading ...
 

Stone Veneer Application in Sharon - During

Posted by Alexandra Storrs on Thursday, December 6, 2012, In : Fireplaces 

We were contracted by these homeowners to spruce up around their wood stove.  Dana is installing a blue stone hearth and applying a cultured stone veneer to the walls up to the ceiling.  The homeowner installed some shelves and Dana worked around them.  http://www.dmstorrschimney.com/our-soot-stories/category/Fireplaces

Continue reading ...
 

Pinckney St., Beacon Hill Rebuilds - Demolition

Posted by Alexandra Storrs on Thursday, December 6, 2012, In : Chimney Rebuilds 

Here we have Brad, Dave & Tim hard at work tearing down the front chimney.  All of the brick debris was brought to the street by hand using buckets & a boom on the scaffolding.  It was then placed into an on site dumpster (we provided) quietly so as not to disturb the neighborhood during the demolition process. http://www.dmstorrschimney.com/our-soot-stories/pinckney-st-beacon-hill-rebuilds-staging
Continue reading ...
 

Pinckney St., Beacon Hill Rebuilds Staging

Posted by Alexandra Storrs on Thursday, October 25, 2012, In : Chimney Rebuilds 
Because access to the chimneys was challenging as was the staging of the building we outsourced the staging aspect of this project.  Many thanks to the crew at Veterans Scaffolding!  For a before picture click  
http://www.dmstorrschimney.com/our-soot-stories/pinckney-st-beacon-hill-rebuild

!

Continue reading ...
 

Pinckney St., Beacon Hill Rebuild

Posted by Alexandra Storrs on Thursday, October 25, 2012, In : Chimney Rebuilds 
Last spring we were contracted to rebuild two chimneys on Pinckney St., Beacon Hill.  To date the front chimney is the largest rebuild Dana has done on Beacon Hill.  This project took about four weeks from start to finish.  This is a picture of the chimney before we got started... 
For other rebuild photos click here http://www.dmstorrschimney.com/our-soot-stories/category/Chimney%20Rebuilds 
Continue reading ...
 

Fireplace in Quincy, MA

Posted by Alexandra Storrs on Tuesday, August 7, 2012, In : Fireplaces 

Dana applied stone veneer to the facade of this woodburning fireplace for a homeowner in Quincy. Hardwood floors and custom carpentry to be done. For other fireplace photos http://www.dmstorrschimney.com/our-soot-stories/category/Fireplaces
Continue reading ...
 

Ground Up Rebuild Norton Complete (2)

Posted by Alexandra Storrs on Friday, June 15, 2012, In : Chimney Rebuilds 
Here is a shot from the ground looking up. Staging has been taken down, site has been cleaned up.  These clients have the best looking chimney in the neighborhood, if we do say so ourselves.  We have another ground up rebuild in Dover, MA later this summer.  As always we'll be blogging about it!  For a close up of the top of the completed chimney http://www.dmstorrschimney.com/our-soot-stories/norton-ground-up-rebuild-complete-
Continue reading ...
 

Norton Ground Up Rebuild Complete!

Posted by Alexandra Storrs on Friday, June 15, 2012, In : Chimney Rebuilds 
Day five of this ground up rebuild has finnally arrived & the chimney is complete.  The stainless steel rain cap has been installed.  Dana averaged laying up 500 brick per day.  Thankfully we had beautiful weather all week for this project & we finished on time.  All that is left is taking down the staging & clean up of the site.  For earlier pictures of this project http://www.dmstorrschimney.com/our-soot-stories/ground-up-rebuild-in-norton-day-4- 

 
...
Continue reading ...
 

Ground Up Rebuild in Norton (Day 4)

Posted by Alexandra Storrs on Tuesday, May 15, 2012, In : Chimney Rebuilds 
The Corbel of the chimney is complete.  The Corbel is optional in the design of a chimney, it is when the brick are "stepped out" & then "stepped in".  All that remains is the Crown & the rain cap, which will be completed on day four of this project.  Day five will be spent on clean up (the roof is spotless when we leave) & the dismantling of the staging.  Check back to see the grand finale!  Again for earlier photos... http://www.dmstorrschimney.com/our-soot-stories/ground-up-rebuild-in-nort...
Continue reading ...
 

Ground Up Rebuild in Norton (day 3)

Posted by Alexandra Storrs on Tuesday, May 15, 2012, In : Chimney Rebuilds 

 Almost done!  This is good look at the flashing, you can see how it is tucked into the mortar joints & stepped down the chimney.  All that is left is the Corbel, Crown & the rain cap.  If you don't know what a Corbel or a Crown of a chimney is, check back to see the finished product, you'll see!  For earlier progression photos  http://www.dmstorrschimney.com/our-soot-stories/ground-up-rebuild-in-norton-day-2-con-t-may-9-2012-7-12-52-pm-52  
Continue reading ...
 

Ground Up Rebuild in Norton (day 2 con't)

Posted by Alexandra Storrs on Wednesday, May 9, 2012, In : Chimney Rebuilds 
 
 Here we are at the end of day 2 on this project, it is the first full day of laying brick.  500 brick were laid up by the end of the day.  As you can see we are installing clay tile flue liner sections as we go.  The one on the right is being reused from the tear down as it is in good shape.  Click here for earlier photos of this project http://www.dmstorrschimney.com/our-soot-stories/ground-up-rebuild-in-norton-day-2-con-t-
Continue reading ...
 

Ground Up Rebuild in Norton (day 2 con't)

Posted by Alexandra Storrs on Wednesday, May 9, 2012, In : Chimney Rebuilds 


This is the progress after just two hours laying brick... as always more to come click this link for earlier pictures of this project http://www.dmstorrschimney.com/our-soot-stories/ground-up-rebuild-norton-day-2-con-t-
Continue reading ...
 

Ground Up Rebuild Norton (day 2, con't)

Posted by Alexandra Storrs on Tuesday, March 6, 2012, In : Chimney Rebuilds 
Thankfully our masonry supplier delivers!  Here he is off loading a pallet of clay tile liner sections.  As Dana rebuilds the chimney new clay tile liner sections are installed, they are joined together using mortar & the brick is laid up around them.  The larger clay tiles are for the fireplace flue & the smaller ones are for the heating flue.  To see photos of the chimney coming down click http://www.dmstorrschimney.com/our-soot-stories/ground-up-rebuild-in-norton-day-2-...
Continue reading ...
 

Ground Up Rebuild in Norton (day 2)

Posted by Alexandra Storrs on Tuesday, March 6, 2012,
 It is the beginning of day 2 on this project & as you can see, the chimney is almost completely torn down to the ground.  We tarped over the exposed flues overnight to keep out visitors. The upcoming photos will show the progression of the new chimney being built.  By the end of day five this ground up rebuild is complete.  Dana laid an average of 500 brick/day.  It helps to have such dedicated "tenders" to mix mortar & move material.
Continue reading ...
 

Ground Up Rebuild in Norton (day 1 con't)

Posted by Alexandra Storrs on Monday, December 12, 2011, In : Chimney Repairs 
Brad is in the process of removing the clay tiles.  We saved and reused what material we could (good for the environment and the homeowners pocket).  For earlier pictures of the staging and tear down process http://www.dmstorrschimney.com/our-soot-stories/ground-up-rebuild-in-norton-day-1-
Continue reading ...
 

Ground Up Rebuild in Norton

Posted by Alexandra Storrs on Monday, December 12, 2011, In : Chimney Repairs 
This next series of blog posts will be about a ground up rebuild completed in 5 days!  These pictures and posts will show the progression of the project beginning with the tearing down of the chimney to the complete reconstruction, with some fun shots in between.  The picture in this post shows the staging and the beginning of the tear down process.  If you look closely you can see the deterioration of the brick.  The deterioration was extensive throughout the height of the chimney, therefore...

Continue reading ...
 

Franklin Institute Boston

Posted by Alexandra Storrs on Thursday, October 27, 2011, In : Commercial Venting 

This picture shows venting from the left side horizontally 20 ft (second of three total wall penetrations) then vertical 30 ft to outside wall termination which is 14 ft off of ground level.  All of this pipe is double wall AL294C special gas vent.  To see the boilers this pipe is venting click 
http://www.dmstorrschimney.com/our-soot-stories/franklin-institute-boston-part-1-


Continue reading ...
 

Franklin Institute Boston (part 1)

Posted by Alexandra Storrs on Thursday, October 27, 2011, In : Commercial Venting 

This is one of two Hydrotherm gas boilers installed at the Franklin Institute of Boston.  It's hard to believe that something so small can heat a building that size.  Dana was contracted to construct and install the AL294C single and double wall pipe for these condensing boilers.  Two 80 ft side wall stacks needed to be constructed and installed to vent these boilers.  The horizontal runs going from the boilers into the 80 ft stacks also needed to be constructed and installed from the same ma...

Continue reading ...
 

Commercial Stainless Steel Stack Construction in Somerville (complete)

Posted by Alexandra Storrs on Thursday, September 8, 2011, In : Commercial Stainless Steel Chimneys 

This is the large stainless steel stack.  It is complete except for the guy supports.  The plate protruding from the outside of the liner near the top is where the guy supports are to be attached.  Click here for earlier photos of this project http://www.dmstorrschimney.com/our-soot-stories/commercial-stainless-steel-stack-construction-in-somerville-part-4-
Continue reading ...
 

Commercial Stainless Steel Stack Construction in Somerville (part 4)

Posted by Alexandra Storrs on Thursday, September 8, 2011, In : Commercial Stainless Steel Chimneys 

Here we can see that two of the smaller stacks have been completed.  They are supported with heavy gauge guy supports.  For earlier progression photos of this project http://www.dmstorrschimney.com/our-soot-stories/commercial-stainless-steel-stack-construction-in-somerville-part-3- One more to go...
Continue reading ...
 

Commercial Stainless Steel Stack Construction in Somerville (part 3)

Posted by Alexandra Storrs on Thursday, September 8, 2011, In : Commercial Stainless Steel Chimneys 

Here is a close up of the transition piece with custom fitted band to connect it to the base.  There is also a drain piece so that the condensation can drain out of the stack.  For a close up of the base piece http://www.dmstorrschimney.com/our-soot-stories/commercial-stainless-steel-stack-construction-in-somerville-part-2- As always, more to follow!
Continue reading ...
 

Commercial Stainless Steel Stack Construction in Somerville (part 2)

Posted by Alexandra Storrs on Wednesday, August 10, 2011, In : Commercial Stainless Steel Chimneys 

This is a close up picture of the custom fabricated stainless steel transition piece at the base of the stainless steel stack.  This is transitioning from a six inch pipe within the building to the seven inch stack to be constructed and installed atop this transition piece.   For an earlier picture of this project http://www.dmstorrschimney.com/our-soot-stories/commercial-stainless-steel-stack-construction-in-somerville
Continue reading ...
 

Commercial Stainless Steel Stack Construction in Somerville

Posted by Alexandra Storrs on Wednesday, August 10, 2011, In : Commercial Stainless Steel Chimneys 

This is the first picture in a series that will be dedicated to stainless steel commercial stack construction and installation.  This is a building in Somerwille which was sited by the EPA due to the raincaps they had on top of the stacks.  The removal of said raincaps would allow water to pour down into the flues which are venting their ovens among other appliances.  Therefore new stacks needed to be constructed and installed with custom termination pieces and  custom fabricated gutter syste...
Continue reading ...
 

Bellfires Fireplace (bbc) Assembly & Installation (complete)

Posted by Alexandra Storrs on Thursday, July 28, 2011, In : Fireplaces 

Bellfires fireplace assembly and installation complete.  All insulation and pipe connections have been made.  For earlier photos of this project http://www.dmstorrschimney.com/our-soot-stories/bellfires-fireplace-bcc-assembly-installation-in-dedham-part-3-  Check back with us, the next series of posts will be about commercial stainless steel stack construction and installtion in Somerville.
Continue reading ...
 

Bellfires Fireplace (bcc) Assembly & Installation in Dedham (part 3)

Posted by Alexandra Storrs on Tuesday, July 19, 2011, In : Fireplaces 

The outside stainless steel housing is in place after it having been insulated.  Stainless steel type H.T. (high temperature) allfuel pipe has been installed from the Bellfires unit into the chimney flue.  To see earlier progression photos http://www.dmstorrschimney.com/our-soot-stories/bellfires-fireplace-bcc-assembly-and-installation-in-dedham-jul-18-2011-10-55-07-pm-7
Continue reading ...
 

Bellfires Fireplace (bcc) Assembly and Installation in Dedham

Posted by Alexandra Storrs on Monday, July 18, 2011, In : Fireplaces 

All refractory panels in the firebox and throat panels installed.  Ceramic fiber insulation is in the process of being wrapped around throat area.  To see the first phase of this project http://www.dmstorrschimney.com/our-soot-stories/bellfires-fireplace-bcc-assembly-and-installation-in-dedham
Continue reading ...
 

Bellfires Fireplace (bcc) Assembly and Installation in Dedham

Posted by Alexandra Storrs on Monday, July 18, 2011, In : Fireplaces 

Installation of a Bellfires close clearance wood fireplace.  Hearth and wood burning stove and chimney build out in this location has been removed for this installation.  Main body of fireplace is installed.  The Bellfires close clearance wood fire place is a super effecient, heating fireplace.  It is designed to be installed on a wood floor and positioned within two inches of rear and side walls.  It uses thermal insulation technology and its refractory firebox is designed to give it the gre...
Continue reading ...
 

Firebox Construction in Reading Complete!!

Posted by Alexandra Storrs on Thursday, June 30, 2011, In : Firebox Construction 

Our job here is done!  Homeowner to have facade and hearth done as a separate project.  Once the facade and hearth are finished this fireplace will be good to go.  We lined the flue with a stainless steel liner to properly vent the combustion from this woodburning fireplace.  To see the progression photos for this project http://www.dmstorrschimney.com/our-soot-stories/firebox-construction-in-reading-part-4-  Check back here, the next project I will be blogging about is a Bellfires Fireplace!...
Continue reading ...
 

Firebox Construction in Reading (part 4)

Posted by Alexandra Storrs on Thursday, June 30, 2011, In : Firebox Construction 

Here is a close up picture of the firebox floor.  It is complete with ashdump installed.  The mortar joints along the firebox walls are curing out that is why they look as white as they do.  The completion photo is to follow.  For the previous pictures for this project http://www.dmstorrschimney.com/our-soot-stories/firebox-construction-reading-part-3-
Continue reading ...
 

Firebox Construction Reading (part 3)

Posted by Alexandra Storrs on Tuesday, June 21, 2011, In : Firebox Construction 

This picture shows the firebox construction in progress.  Here we see the side and back walls of the firebox just about complete.  The firebox floor is complete with ashdump door installed.  The fascade and hearth are still to be built.  For earlier progression photos click here http://www.dmstorrschimney.com/our-soot-stories/firebox-reconstruction-in-reading-part-2-  As always do check back for more progression pictures on this project.
Continue reading ...
 

Firebox Reconstruction in Reading (part 2)

Posted by Alexandra Storrs on Wednesday, June 8, 2011, In : Firebox Construction 

Just a fun picture of the remnants of our client's firebox in the back of Dana's truck.  Click here to see the demolition http://www.dmstorrschimney.com/our-soot-stories/firebox-reconstruction-in-reading-part-1- As always, more to follow!!
Continue reading ...
 

Firebox Reconstruction in Reading (part 1)

Posted by Alexandra Storrs on Monday, June 6, 2011, In : Firebox Construction 

This firebox had to be removed for several reasons.  It was not original to the victorian era house & did not meet today's clearance to combustibles codes (it was too close to the wall studs) & very well could have caused a house fire.  Charred wood was found inside the walls and underneath the hearth extension during demolition.  As with all our projects I will be showing progression photos.  This photo is of the demolition in progress, more photos to follow... click here to see other firebo...
Continue reading ...
 

Chimney Rebuild in Somerville (complete)

Posted by Alexandra Storrs on Friday, May 20, 2011, In : Somerville restoration project 

This single flue chimney rebuild is complete.  Dana installed a stainless steel rain cap atop the newly rebuilt chimney to keep out water & critters.  To see the progression photos for this job
http://www.dmstorrschimney.com/our-soot-stories/chimney-rebuild-in-somerville-con-t-
Stay tuned, our next project is a fireplace reconstruction in Reading.  I'll be posting blogs with photos about that project next week.
Continue reading ...
 

Chimney Rebuild in Somerville (con't)

Posted by Alexandra Storrs on Tuesday, May 17, 2011, In : Somerville restoration project 

This chimney rebuild is well underway & the flashing is complete.  This project took one day from start to finish.  This is a good look at the jobsite on the roof, most of us won't get this close up.  What we see here are roof racks with an OSHA plank across the top of them.  This gives Dana & Brad a secure platform to work on.  To the right is the ridge hook ladder so they can climb to the ridge of the roof to get to the brick stacked there to continue the rebuild.  This link will take you t...
Continue reading ...
 

Chimney Rebuild in Somerville

Posted by Alexandra Storrs on Friday, May 13, 2011, In : Somerville restoration project 

Spring is here & so are the masonry projects!!  This is the begining of a single flue chimney rebuild.  The chimney has been torn down to the roofline & new lead flashing has been installed.  I like how the brick to be used for the rebuild are lined up along the ridge of the roof.  Check back with us to see the completion of this project.  To see a similar project in Somerville http://www.dmstorrschimney.com/our-soot-stories/chimney-complete-somerville
Continue reading ...
 

Adding Clay Tiles in Belmont (complete)

Posted by Alexandra Storrs on Thursday, May 12, 2011, In : Chimney Repairs 

The clay tile installation is complete!  You can see them just above the new cement crown underneath the rain cap.  Notice there is a good amount of space between the tops of the clay tiles and the lid of the rain cap.  You don't want the lid of the rain cap to be too close to the tops of the clay tiles, as that can affect the draft of whatever is venting into those flues.  This is the link for previous pictures of this project http://www.dmstorrschimney.com/our-soot-stories/adding-clay-flue-...
Continue reading ...
 

Adding Clay Flue Tiles in Belmont

Posted by Alexandra Storrs on Friday, May 6, 2011, In : Chimney Repairs 

Here is a look inside the chimney from the top down.  What you're seeing are clay flue tiles that are for individual flues within the chimney.  However, they are not extended to the top of the chimney, as they should be.  Our job here is to extend those clay tiles to the top of the chimney & finish off with a new cement crown with a rain cap.  This was a day long project.  As always, there will be more photos to follow.  To see a similar project http://www.dmstorrschimney.com/our-soot-stories...
Continue reading ...
 

Chimney Scams... a follow up

Posted by Alexandra Storrs on Friday, May 6, 2011, In : Top Hat Tips 
Back in December I posted a blog discussing chimney sweep scams.  Dana, the owner of DM Storrs Chimney was called in by the Needham Police Dept as an industry expert to double check the safety of those residents who were victims of said scam.  This was a service Dana was pleased to offer pro bono & happily no ones safety was compromised. 

We are very happy to report that, according to the Needham Police Dept, the suspects who were scamming the elderly residents in their town have been aprehen...
Continue reading ...
 

Fireplace/Firebox Construction Mansfield Complete!!

Posted by Alexandra Storrs on Friday, April 8, 2011, In : Fireplaces 

After five days our project in Mansfield is complete!  The bluestone hearth is in place and the masonry has cured.  This is the first field stone fireplace Dana has constructed, he is very proud of it.  The homeowners are delighted and can't wait to use it.  For earlier progression pictures click http://www.dmstorrschimney.com/our-soot-stories/fireplace-firebox-construction-mansfield-day-4-complete-  We look forward to the opportunity to create something beautiful that will last a lifetime fo...
Continue reading ...
 

Fireplace/Firebox Construction Mansfield (day 4 complete)

Posted by Alexandra Storrs on Monday, March 28, 2011, In : Fireplaces 

End of day four.  The hearth is complete except for the bluestone piece which will go over the top.  The facade is almost finished, Dana still has to apply the stone across the top of the firebox opening.  http://www.dmstorrschimney.com/our-soot-stories/fireplace-firebox-construction-mansfield-day-4- this is the link for earlier pictures.
Continue reading ...
 

Fireplace/Firebox Construction Mansfield (day 4)

Posted by Alexandra Storrs on Monday, March 28, 2011, In : Fireplaces 

Beginning of day four.  The stone veneer has been applied to the front of the raised hearth.  The application of the stone will continue around the fireplace facade.  The stone used for this project is Padova Field Ledge Stone. For earlier pictures of this project click here http://www.dmstorrschimney.com/our-soot-stories/fireplace-firebox-construction-mansfield-day-3-complete- Almost done so don't forget to check back with us to see the finished project!
Continue reading ...
 

Fireplace/Firebox Construction Mansfield (day 3 complete)

Posted by Alexandra Storrs on Wednesday, March 23, 2011, In : Firebox Construction 

End of day three.  The firebox, facade and hearth are complete.  All that is left to do is apply the stone veneer to the facade and the bluestone atop the hearth. To see before the facade was complete http://www.dmstorrschimney.com/our-soot-stories/fireplace-firebox-construction-mansfield-day-3-  Check back to see the stone veneer complete, it looks amazing!!
Continue reading ...
 

Fireplace/Firebox Construction Mansfield (day 3)

Posted by Alexandra Storrs on Wednesday, March 23, 2011, In : Firebox Construction 

Day three of our fireplace construction project.  The firebox walls and back are complete & the damper is in place.  The damper is sitting atop the firebox, it looks like a hood.  The smoke chamber is also complete.  Next the facade needs to be constructed.  For earlier progression photos http://www.dmstorrschimney.com/our-soot-stories/fireplace-firebox-construction-mansfield-day-2-complete-  Be sure to check back for more photos of this project.
Continue reading ...
 

Fireplace/Firebox Construction Mansfield (day 2 complete)

Posted by Alexandra Storrs on Monday, March 21, 2011, In : Firebox Construction 

End of the second day.  The firebox floor is complete, two more courses of brick to go on the side walls and three courses of brick to finish the back wall of the firebox.  We had Dana stand next to his creation to show the size of the fireplace.  For earlier photos http://www.dmstorrschimney.com/our-soot-stories/fireplace-firebox-construction-mansfield-day-2-con-t-
Continue reading ...
 

Fireplace/Firebox Construction Mansfield (day 2 con't)

Posted by Alexandra Storrs on Monday, March 21, 2011, In : Firebox Construction 

This is a close up picture of the firebox floor.  Nice, neat mortar joints between the red firebrick.  The next picture will show the back and side walls of the firebox.  For previous progression pictures http://www.dmstorrschimney.com/our-soot-stories/fireplace-firebox-construction-mansfield-day-2-
Continue reading ...
 

Fireplace/Firebox Construction Mansfield (day 2)

Posted by Alexandra Storrs on Friday, March 18, 2011, In : Firebox Construction 

Day two... as you can see the foundation for the raised hearth has been built.  Dana has also started on the firebox floor.  The interior of the firebox is being constructed in red firebrick also referred to as fire clay brick.  These brick are used for firebox construction to meet todays standards and codes.  They are meant to withstand the effects of long term fireplace usage.  For photos of day one  http://www.dmstorrschimney.com/our-soot-stories/fireplace-firebox-construction-mansfield-da...
Continue reading ...
 

Fireplace/Firebox Construction Mansfield (day 1 complete)

Posted by Alexandra Storrs on Friday, March 18, 2011, In : Firebox Construction 

Here we are at the end of the first day of construction.  The rug has been cut away in preparation for the construction of the raised hearth.  The firebox walls have been parged (skimcoated) with cement.  The clay flue tiles have been repaired.  Please check back for the progression photos, there will be quite a few this is a five day project.  Click here for earlier photos http://www.dmstorrschimney.com/our-soot-stories/fireplace-firebox-construction-mansfield-day-1-con-t-...
Continue reading ...
 

Fireplace/Firebox Construction Mansfield (day 1 con't)

Posted by Alexandra Storrs on Thursday, March 17, 2011, In : Firebox Construction 

This photo shows the hole made into the chimney which will house the raised hearth fireplace.  The raised hearth will come twelve inches off the floor.  Please check back here to see the progress of this project.  To see the previous photo http://www.dmstorrschimney.com/our-soot-stories/fireplace-firebox-construction-mansfield-day-1
Continue reading ...
 

Fireplace/Firebox Construction Mansfield (day 1)

Posted by Alexandra Storrs on Thursday, March 17, 2011, In : Firebox Construction 

This is a before picture, the wall was removed to expose the chimney.  This client has a chimney containing three flues, one of which is used to vent her heating appliance, the other two are inert.  Dana will turn this into a raised hearth, wood burning fireplace with stone veneer.  It will vent into the two inert flues which are clay tile lined.  Dana is using the two flues in order to create a taller, wider fireplace.  Please check back here to see the progress on this project.  For other f...
Continue reading ...
 

Best reason to install a Rain Cap (unwanted tenants)

Posted by Alexandra Storrs on Thursday, March 10, 2011, In : Top Hat Tips 

This is a photo looking down into a clients ash dump.  The flashlight is shining down on a 20 lb raccoon, who has made herself quite comfortable down there.  The ash dump is located underneath the fireplace floor.  Ashes are swept into the ash dump and removed from the base of the chimney.  No, we don't have any idea how she got down there.  We did humanely remove her & install a chimney cap, much to the clients relief!  For other Top Hat Tips http://www.dmstorrschimney.com/our-soot-stories/-...
Continue reading ...
 

Newton Liner

Posted by Alexandra Storrs on Thursday, March 3, 2011, In : Liner Jobs 

Dana standing atop the chimney prior to liner installation.  This is a stainless steel liner to vent a wood burning fireplace.  For other liner job photos http://www.dmstorrschimney.com/our-soot-stories/a-week-in-winthrop-lining-chimney-
Continue reading ...
 

#1 Reason to have your fireplace inspected & swept...

Posted by Alexandra Storrs on Thursday, March 3, 2011, In : Top Hat Tips 

This is a whopping pile of creosote!!!  This is what came out of a clients fireplace flue.  Too much creosote build up can result in a chimney fire.  The NFPA (National Fire Protection Agency) recommends inspecting and sweeping a flue venting wood combustion after each cord of wood burned.  For other Top Hat Tips http://www.dmstorrschimney.com/our-soot-stories/top-hat-tips-feb-4-2011-10-42-02-pm-2
Continue reading ...
 

Top Hat Tips

Posted by Alexandra Storrs on Friday, February 4, 2011, In : Top Hat Tips 
Oil prices are way up, and natural gas prices are way down(due to new sources). Remember to have the gas flues checked also and if converting from oil to gas it is CODE to have a certified chimney sweep "certify" it's use.
Continue reading ...
 

Top Hat Tips

Posted by Alexandra Storrs on Wednesday, January 12, 2011, In : Top Hat Tips 
We would like to remind anyone who has a power vented heating system to be sure the snow isn't blocking the vent exiting the side of the house.  The same holds true for clothes dryer vents.  Enjoy the snow!!  For additional Top Hat Tips...  http://www.dmstorrschimney.com/our-soot-stories/category/Top%20Hat%20Tips
Continue reading ...
 

Firebox Restoration in Precinct One, Dedham, Ma (complete)

Posted by Alexandra Storrs on Monday, January 10, 2011, In : Firebox Construction 

Here is the completed back wall of the firebox.  Notice the way the back wall curves and all the cuts in the brick to get a perfect fit.  To see the before picture http://www.dmstorrschimney.com/our-soot-stories/firebox-restoration-in-precinct-one-dedham-ma
Continue reading ...
 

Firebox Restoration in Precinct One, Dedham, Ma

Posted by Alexandra Storrs on Monday, January 10, 2011, In : Firebox Construction 

A local contractor saw Dana working down the street from his house for four days. Was pleased with what he saw & asked Dana if he could fix his fireplace.  In this picture you can see that the back wall of the firebox has been removed in preparation for a new back wall to be constructed.  For another fireplace restoration project click http://www.dmstorrschimney.com/our-soot-stories/firebox-reconstruction-in-reading-ma-complete-
Continue reading ...
 

Firebox Reconstruction in Reading, Ma (complete)

Posted by Alexandra Storrs on Monday, December 27, 2010, In : Firebox Construction 

Our job is done here.  All set for the finish work, i.e. facade and hearth.  On to the next project.  Click here for progression photos of this job http://www.dmstorrschimney.com/our-soot-stories/firebox-reconstruction-reading-part-4-
Continue reading ...
 

Firebox Reconstruction Reading (part 4)

Posted by Alexandra Storrs on Monday, December 27, 2010, In : Firebox Construction 

Almost done... the brick across the top of the firebox are in place.  You can no longer see the damper and the lintel.  Click here to see the damper and the lintel in place http://www.dmstorrschimney.com/our-soot-stories/firebox-reconstruction-reading-part-3-
Continue reading ...
 

Firebox Reconstruction Reading

Posted by Alexandra Storrs on Wednesday, December 22, 2010, In : Firebox Construction 

Here you can see the back and side walls of the firebox are complete.  To see the 1st part of this project http://www.dmstorrschimney.com/our-soot-stories/firebox-reconstruction-reading  More progression photos to follow...
Continue reading ...
 

Beware of Chimney Scams

Posted by Alexandra Storrs on Monday, December 13, 2010, In : Top Hat Tips 
I write this as information to you, our clients both existing or potential.  I have seen news stories about these chimney scam artists and have spoken to people who have been victims of them as well.  Today we have been made aware of multiple incidents in two local towns.  The victims have been elderly and have been taken for about $4000 for work that was done with the wrong material and done incorrectly.  Please do your homework!!!  Ask for credentials i.e. certification through the CSIA (Ch...
Continue reading ...
 

South Weymouth (complete)

Posted by Alexandra Storrs on Thursday, December 9, 2010, In : South Weymouth 

Here is the finished product!  New stainless steel rain cap, new crown (notice cement smoothed out to edges of brick) new mortar joints & clay tiles.  For progression photos on this job click http://www.dmstorrschimney.com/our-soot-stories/south-weymouth-con-t-
Continue reading ...
 

South Weymouth (con't)

Posted by Alexandra Storrs on Wednesday, December 8, 2010, In : South Weymouth 

Here is the second phase... The crown has been poured, the clay flue tiles extended & the mortar joints filled.  The crown is not quite finished, the cement still needs to be smoothed out to the edges of the brick.  To see the chimney before http://www.dmstorrschimney.com/our-soot-stories/south-weymouth-before-
Continue reading ...
 

South Weymouth (before)

Posted by Alexandra Storrs on Wednesday, December 8, 2010, In : South Weymouth 

Here is our client's chimney before.  The chimney lacks a crown, the top course of brick are missing mortar joints and the flue tiles are below the chimney top
Continue reading ...
 

Top Hat Tips

Posted by Alexandra Storrs on Monday, November 29, 2010, In : Top Hat Tips 
From NFPA: An estimated 15,200 reported creosote fires (23% of all home heating fires) resulted in four civilian deaths, 17 civilian injuries, and $33 million in direct property damage, on average, each year from 2004-2008.

Check out the information and more tools available as part of NFPA's new safety campaign "Put a Freeze on Winter... Fires" at www.nfpa.org/winterSee More
www.nfpa.org
Here are some statistics from NFPA's report, “Home F...

Continue reading ...
 

Revere Street Boston (complete)

Posted by Alexandra Storrs on Tuesday, November 23, 2010, In : Revere Street Liner 

Here is a great shot of the view from atop Revere St., Beacon Hill.  The chimney in the corner is the one Dana & Brad lined.  You can see the lid of the rain cap has been put back on, they are done!!  All in a day's work.  For other photos of this job http://www.dmstorrschimney.com/our-soot-stories/revere-st-boston-smoke-pipe-work-
Continue reading ...
 

Revere St., Boston (smoke pipe work)

Posted by Alexandra Storrs on Monday, November 22, 2010, In : Revere Street Liner 

This is a look at the smoke pipe work (sometimes referred to as breeching pipe) in the basement.  All of the smoke pipe was replaced due to corrosion from condensation.  It enters the base of the chimney above the cleanout door, it is then attached to the liner using a tee and a tee cover before the hole in the chimney is sealed.  In the future when the flue needs to be swept or inspected we open the cleanout door, remove the tee cover & then run brushes!  For other pictures of this job  http...
Continue reading ...
 

Revere St., Boston liner job (part 2)

Posted by Alexandra Storrs on Thursday, November 18, 2010, In : Revere Street Liner 

Here Brad is finishing up the liner installation.  They removed the lid of the rain cap in order to line the chimney.  The lid will be put back on when they are done. For other pictures of this job http://www.dmstorrschimney.com/our-soot-stories/revere-st-boston-liner-job
Continue reading ...
 

Revere St., Boston liner job

Posted by Alexandra Storrs on Wednesday, November 17, 2010, In : Revere Street Liner 

Begining of a liner job on Revere St., Boston.  Getting parking on Beacon Hill right outside the job site is an added bonus!  More pictures to follow... To see another Boston liner job click http://www.dmstorrschimney.com/our-soot-stories/fireplace-flue-liners-marlborough-st-boston
Continue reading ...
 

Modular Firebox Construction (finished)

Posted by Alexandra Storrs on Friday, November 12, 2010, In : Modular Fireplace Construction 

Dana's part in this project is finished!  All that is left is the installation of the firebrick to line the inside of the firebox & the granite facade.  It was a long day, notice it's dark out!!  For other photos http://www.dmstorrschimney.com/our-soot-stories/modular-firebox-construction-part-4-
Continue reading ...
 

Modular Firebox Construction (part 4)

Posted by Alexandra Storrs on Wednesday, November 10, 2010, In : Modular Fireplace Construction 

The firebox floor, walls and back are finished.  Almost done, when we are it will be ready for the contractors to install the granite facade and mantle.  Click here to see progression photos http://www.dmstorrschimney.com/our-soot-stories/modular-firebox-construction-newton-part-3-
Continue reading ...
 

Modular Firebox Construction, Newton (part 3)

Posted by Alexandra Storrs on Tuesday, November 9, 2010, In : Modular Fireplace Construction 

Here the second piece of the platform has been added, next are the firebox walls.  For the first part of the platform http://www.dmstorrschimney.com/our-soot-stories/modular-fireplace-construction-part-2-
Continue reading ...
 

Modular Fireplace Construction (part 2)

Posted by Alexandra Storrs on Thursday, November 4, 2010, In : Modular Fireplace Construction 

In this photo the first part of the platform upon which the fireplace will be built has been installed.  Doesn't look like much now, but wait... To see the project before we got started http://www.dmstorrschimney.com/our-soot-stories/modular-fireplace-construction
Continue reading ...
 

Modular Fireplace Construction

Posted by Alexandra Storrs on Thursday, November 4, 2010, In : Modular Fireplace Construction 

The next few blog posts will be a progression of the construction of a modular fireplace.  Here we see the pieces and parts of what will become (after a very long day) a completed modular fireplace.  To see another fireplace construction project  http://www.dmstorrschimney.com/our-soot-stories/firebox-construction-complete
Continue reading ...
 

A Week in Winthrop (finished!)

Posted by Alexandra Storrs on Monday, November 1, 2010, In : A Week in Winthrop 

Again, this photo is from the homeowner.  The job is complete!!  Dana, ever the perfectionist, is making sure the newly installed rain cap is level.  To see progression photos of this project click http://www.dmstorrschimney.com/our-soot-stories/a-week-in-winthrop-liner-almost-finished-
Continue reading ...
 

A Week in Winthrop (liner almost finished)

Posted by Alexandra Storrs on Thursday, October 28, 2010, In : A Week in Winthrop 

Another homeowner picure!  Dana and Brad getting the last of the liner into the flue.  Almost done, all that's left is to install the stainless steel raincap (& take down & pack up all the staging)!  Other liner pictures http://www.dmstorrschimney.com/our-soot-stories/a-week-in-winthrop-dana-liner-
Continue reading ...
 

A Week in Winthrop (Dana liner)

Posted by Alexandra Storrs on Wednesday, October 27, 2010, In : A Week in Winthrop 

Another homeowner picture... Dana balancing carefully on the edges of the chimney to guide the last portion of the liner into the flue.  Click here to see Dana and Brad getting the liner into the flue http://www.dmstorrschimney.com/our-soot-stories/a-week-in-winthrop-lining-chimney-
Continue reading ...
 

A Week in Winthrop (lining chimney)

Posted by Alexandra Storrs on Wednesday, October 27, 2010, In : A Week in Winthrop 

This is one of many pictures taken by the homeowner.  We are very happy to have them, as it is rare for us to get both Dana and Brad in action!  Dana is on the chimney guiding the liner down into the flue while Brad is holding the liner steady.  To see previous pictures of this job http://www.dmstorrschimney.com/our-soot-stories/a-week-in-winthrop-rebuild-complete-
Continue reading ...
 

A Week in Winthrop (part one of rebuild)

Posted by Alexandra Storrs on Thursday, October 21, 2010, In : A Week in Winthrop 

Here we are it is day one of the rebuilding process.  The chimney nor the flashing is complete.  Dana still has to add the corbel and the crown to the top of the chimney.  He also needs to finish the flashing.  Notice how the flashing is stepped and inserted into the mortar joints of the chimney.  To see how the chimney looked before he got started http://www.dmstorrschimney.com/our-soot-stories/a-week-in-winthrop-chimney-before-
Continue reading ...
 

A Week in Winthrop (chimney torn down to roofline)

Posted by Alexandra Storrs on Wednesday, October 20, 2010, In : A Week in Winthrop 

Continue reading ...
 

A Week in Winthrop (chimney before)

Posted by Alexandra Storrs on Wednesday, October 20, 2010, In : A Week in Winthrop 
Here is the chimney before the tear down & rebuilding process begins.  To see the staging aspect of the job http://www.dmstorrschimney.com/our-soot-stories/a-week-in-winthrop-oct-18-2010-11-23-25-pm-25
Continue reading ...
 

A Week in Winthrop (staging)

Posted by Alexandra Storrs on Monday, October 18, 2010, In : A Week in Winthrop 

Continue reading ...
 

Top Hat Tips

Posted by Alexandra Storrs on Monday, October 18, 2010, In : Top Hat Tips 
As the temperatures begin to fall, critters will be looking for a place to keep warm.  Your chimney flue may make the perfect home.  Make sure you have a rain cap atop your chimney to prevent an animal or it's nest from obstructing your flue.  For more Top Hat Tips http://www.dmstorrschimney.com/our-soot-stories/top-hat-tips
Continue reading ...
 

A Week in Winthrop

Posted by Alexandra Storrs on Monday, October 18, 2010, In : A Week in Winthrop 

Beginning of day one in Winthrop.  We are loaded up with all the staging for the job, there are seven lifts, aluminum planks and all the necessary accessories (not much else would fit).  The staging was erected and the chimney torn down to the roofline today.  Click here to see another job which required all this staging http://www.dmstorrschimney.com/our-soot-stories/rebuild-in-somerville-staging
Continue reading ...
 

Top Hat Tips

Posted by Alexandra Storrs on Monday, October 4, 2010, In : Top Hat Tips 
Did you know... that the National Fire Protection Agency (NFPA) recommends your wood burning fireplace or stove be swept after each cord of wood burned??  This is to avoid excess creosote build up.  A cord of wood is 4'x4'x8' and has a volume of 128 cubic feet.
Continue reading ...
 

Custom Copper Rain Caps in NH

Posted by Alexandra Storrs on Monday, October 4, 2010, In : New Hampshire Copper Rain Caps 

This is a large custom order copper rain cap for one of our Beacon Hill clients.  She wanted this rain cap to keep squirrels out of her chimney at her vacation home in NH.  More pictures to follow of this and the second rain cap installed on the rear chimney.  This cap is on the large center chimney of her home.  To see other custom copper rain caps http://www.dmstorrschimney.com/our-soot-stories/custom-copper-raincaps-boston-2
Continue reading ...
 

View from roof on Marlborough St., Boston

Posted by Alexandra Storrs on Friday, September 24, 2010, In : Marlborough St., Boston liner job 

Here is an awesome picture from atop the roof on Marlborough St. in beautiful Back Bay Boston.  They are looking outbound towards Massachusetts Avenue. http://www.dmstorrschimney.com/our-soot-stories/fireplace-flue-liners-marlborough-st-boston
Continue reading ...
 

Fireplace flue liners Marlborough St., Boston

Posted by Alexandra Storrs on Friday, September 24, 2010, In : Marlborough St., Boston liner job 

Here we are loaded up with 80' of 304 stainless steel heavy wall fireplace liner.  It was quite a challenge to get all of this material loaded onto our truck, but there it is!  Heading into Boston's Back Bay for two days so our client can have her fireplaces up and working for the holidays. To see other liner jobs http://www.dmstorrschimney.com/our-soot-stories/brookline-liner
Continue reading ...
 

Brookline Liner

Posted by Alexandra Storrs on Friday, September 17, 2010, In : Brookline Liner 

Here Dana & Brad are loading 40' of stainless steel liner for a boiler flue in Brookline.  Unfortunately we don't have pictures of the installation process (they were too busy).  To see part of an installation http://www.dmstorrschimney.com/our-soot-stories/belmont-stainless-steel-liner-new-construction
Continue reading ...
 

Firebox construction complete

Posted by Alexandra Storrs on Monday, September 13, 2010, In : Firebox Construction 

Construction of the firebox is complete.  Once the flue is lined this will be a working fireplace.  It is ready for the builder to add the finishing touches.  The facade will be the final addition to this project.  To see other stages of this project http://www.dmstorrschimney.com/our-soot-stories/firebox-construction-part-3
Continue reading ...
 

Firebox construction part 3

Posted by Alexandra Storrs on Thursday, September 9, 2010, In : Firebox Construction 

A lot of progress has been made.  The inside walls of the firebox are complete, as is the facade.  All that is left to do is finish the top.  To see earlier photos of this project http://www.dmstorrschimney.com/our-soot-stories/firebox-construction-part-2
Continue reading ...
 

Firebox construction part 2

Posted by Alexandra Storrs on Friday, September 3, 2010, In : Firebox Construction 

You can see the back wall and the floor of the firebox is complete using yellow firebrick.  There are a few more phases of this project to follow, so be sure to check back with us.  To see the before we got started picture click
http://www.dmstorrschimney.com/our-soot-stories/firebox-construction
Continue reading ...
 

Firebox construction

Posted by Alexandra Storrs on Wednesday, September 1, 2010, In : Firebox Construction 

This is the start of a firebox reconstruction project in Boston.  Dana had the luxury of starting anew in a gutted condo unit.  It doesn't look like much in this picture... it gets better, much better.  Check back for follow up photos.  For other completed fireplace projects http://www.facebook.com/home.php?#!/album.php?aid=27776&id=130661380277547&ref=mf
Continue reading ...
 

Accolade

Posted by Alexandra Storrs on Tuesday, August 24, 2010, In : Accolades 

The following was emailed to us on 8/17, after Dana did an inspection for an antique stove located on Beacon Hill in Boston.  This is from the architect, Juan Guillermo Uribe Rubio with Pauli & Uribe Architects, with whom Dana met;

"We had the pleasure of meeting Dana Storrs.  If you ever need someone to look at a stove, DS is your person.  He is incredibly polite and very knowledgeable".

(Parts of the email have been omitted to protect the privacy of the parties involved)
 

...


Continue reading ...
 

Fireplaces

Posted by Alexandra Storrs on Monday, August 23, 2010, In : Fireplaces 
Check out this site to see some examples of Dana's work on fireplaces.  All the fireplaces seen on this site are his work.  One of them was a completely new construction
http://www.bogerco.com/Historical.html

Continue reading ...
 

Welcome Brad!

Posted by Alexandra Storrs on Tuesday, August 17, 2010, In : welcome Brad 

Please join us in welcoming Brad to our DM Storrs Chimney family.  This job in Arlington, is his first job with us & his first time using a grinder.  He did an awesome job!!  Sorry Brad, I know it's not the most flattering picture, but it's all I had.  We look forward to you growing with us.  Click to see another job with Brad as photographer http://www.dmstorrschimney.com/our-soot-stories/belmont-stainless-steel-liner-new-construction
Continue reading ...
 

Belmont stainless steel liner new construction

Posted by Alexandra Storrs on Monday, August 16, 2010, In : Belmont liner 

If you look closely, you can see Dana standing atop the chimney.  At this job in Belmont he had to remove the existing liner (it wasn't the correct material for the appliance venting into it) & had to install the correct liner for the appliance.  I don't want to know how he got up there... to see another liner job http://www.dmstorrschimney.com/our-soot-stories/liner-custom-copper-raincaps-in-boston
Continue reading ...
 

Custom Copper Raincaps Boston #2

Posted by Alexandra Storrs on Wednesday, August 11, 2010, In : Boston South End Project 

Here is the second copper raincap installed in Boston's South End.  Again, the only masonry was the new crown.  To see the first one  http://www.dmstorrschimney.com/our-soot-stories/custom-copper-raincaps-in-boston
Continue reading ...
 

Custom Copper Raincaps in Boston

Posted by Alexandra Storrs on Wednesday, August 11, 2010, In : Boston South End Project 

This is one of the copper raincaps we installed in Boston's South End.  We did not have time to take pictures of the lining aspect of this job.  Dana & Bruce spent over 10 hours removing the old deteriorated liner & installing the new one.  The only masonry part of this job is the new crown to which the cap is adhered.  To see the liner prior to installation http://www.dmstorrschimney.com/our-soot-stories/liner-custom-copper-raincaps-in-boston
Continue reading ...
 

Liner & Custom Copper Raincaps in Boston

Posted by Alexandra Storrs on Thursday, August 5, 2010, In : Boston South End Project 

Loaded up with 70' of stainless steel liner for a job in Boston's South End.  The liner is the first part of this two day project.  The second day will be installation of two custom order copper hip ridge rain caps.  As always, check back with us for upcoming photos and blog updates on this job.  To see the most recently completed project http://www.dmstorrschimney.com/our-soot-stories/charlestown-rebuild-complete
Continue reading ...
 

Charlestown Rebuild complete

Posted by Alexandra Storrs on Friday, July 30, 2010, In : Charlestown Rebuild 

What a difference a day makes!!  Dana & Bruce were ahead of schedule on this job.  Notice the flashing, raincap, oh yes & of course the view!  That's the Tobin Bridge in the background.  To see before pictures click http://www.dmstorrschimney.com/our-soot-stories/charlestown-rebuild-chimney-torn-down-
Continue reading ...
 

Charlestown Rebuild (chimney torn down)

Posted by Alexandra Storrs on Thursday, July 29, 2010, In : Charlestown Rebuild 

The chimney has been torn down to the roofline.  What you see here are 2 aluminum liners used to vent gas appliances & an unused clay tile lined flue.  To see the chimney before the tear down click http://www.dmstorrschimney.com/our-soot-stories/charlestown-rebuild-day-1-con-t-again-
Continue reading ...
 

Charlestown rebuild day 1 (con't again)

Posted by Alexandra Storrs on Thursday, July 29, 2010, In : Charlestown Rebuild 

Just before the tear down is to begin.  They have started bringing the brick up to the roof.  We did not use staging on this job because it was located @ a busy intersection in Charlestown.  In order to keep the cost down for the homeowner
Dana & Bruce hand carried the brick to roof.  Love the view, notice the Tobin Bridge in the background.  For closeups of this chimney click http://www.dmstorrschimney.com/our-soot-stories/charlestown-rebuild-day-1-con-t-
Continue reading ...
 

Charlestown Rebuild day 1 (con't)

Posted by Alexandra Storrs on Tuesday, July 27, 2010, In : Charlestown Rebuild 

A look at the chimney from a different angle.  Someone did patch the chimney at one point, the cement is coming off the chimney.  Click here for a better look at the base of the chimney http://www.dmstorrschimney.com/our-soot-stories/charlestown-rebuild-day-1
Continue reading ...
 

Chimney complete Somerville

Posted by Alexandra Storrs on Friday, July 23, 2010, In : Somerville restoration project 

Rebuild complete!!  Good as new... notice the flashing & corbel @ top of chimney.  To see before pictures
http://www.dmstorrschimney.com/our-soot-stories/chimney-taken-down-to-the-roof-somerville
Continue reading ...
 

Chimney taken down to the roof Somerville

Posted by Alexandra Storrs on Tuesday, July 20, 2010, In : Somerville restoration project 

This is the chimney taken down to the roofline.  Work was also done in the attic.  Dana rebuilt the chimney from this point up.
http://www.dmstorrschimney.com/our-soot-stories/rebuild-in-somerville-staging  click this link to see the staging it took to get Dana to the roof!
Continue reading ...
 

4th of July with DM Storrs Chimney

Posted by Alexandra Storrs on Friday, July 2, 2010, In : 4th of July Celebration 
In honor of the 4th of July we @ DM Storrs Chimney are volunteering our truck for the Needham, Ma 4th of July parade.  We will be transporting the WWII veterans for VFW post #2498 throughout the parade course.  Needham's parade draws a huge crowd from all over!  Join in the festivities... family fun for all!!  See you there.
Continue reading ...
 

DM Storrs Chimney - New Logo

Posted by Alexandra Storrs on Tuesday, June 29, 2010, In : DM Storrs Chimney Logo 


Starting July 1, 2010, you will be seeing a big beige truck with this logo (except with red bricks) driving around Foxborough & the Greater Boston area. It's official, Dana M. Storrs is in business. Join us on a weekly basis and see all the new jobs we will be highlighting in Our Soot Stories. Whether it's building, repairing or cleaning your chimney, you will be pleased with the professional service from estimation to completion.

If you see us around town, beep and give us a wave, we're your...


Continue reading ...
 

Domain mapped and ready to go! www.dmstorrschimney.com

Posted by Alexandra Storrs on Tuesday, June 29, 2010, In : Welcome 
We are officially up and running!

www.dmstorrschimney.com


Continue reading ...
 

Welcome to our Website and Blog!

Posted by Alexandra Storrs on Tuesday, June 29, 2010, In : Welcome 

Welcome to the DM Storrs Chimney website and Soot Stories Blog. Visit us regularly to see projects, in all areas of Boston, that range from chimney cleaning to chimney repair.

Follow us on Facebook at http://tinyurl.com/dmstorrs


Continue reading ...
 
 
xyz

About Me


Dana M Storrs AT DM Storrs Chimney, we combine traditional chimney sweeping methods with current and future technologies in the chimney and venting industry. We are a fully-insured and licensed family owned business serving your local community. Chimney Safety Institute of America(CSIA) certified Massachusetts Construction Supervisor License (CSL) OSHA trained